Week 8

September 7, 2004  – The subfloor is being finished off.  The rough plumbing and gas are in place, including the lines to the backyard.  The HVAC ductwork for downstairs is now in place.  Both of the porches are framed now, so you can get a better idea of the overall layout.  And wall framing has begun.