Week 9

September 13, 2004 — Monday started with the under-floor inspection.  Then we added some insulation to those open sections.  Ted and the guys closed up the subfloor and started framing the interior walls downstairs. The floor joists for the second floor went up and you could start to see how that angled doorway looks into the family room.

Week 10

Last Week