Week 11

September 27, 2004 — We started framing the second floor, after setting out loose boards to show where the walls wound be last Friday.  We made a few tweaks.*  Ted put me to work, helping to put the side wall up (“Stop taking pictures and do some work!”).  And the second floor roof joists were started on Friday afternoon.

Week 12

Last Week

*I wish I had made one other tweak, in the laundry room.  Make sure that you can open the dryer door and the room door at the same time!