Week 19
November 22, 2004 — Tony Moreali arrived, with his crew, to start putting in the electrical system. The photo is of the secondary panel upstairs. Ted finished the base of the master shower, which carefully slopes towards the drain. And the bow windows finally arrived. I started stripping paint off the old doors. The shingles arrived last week, but they started placing them on Friday (the day after Thanksgiving!)