Week 21
December 6, 2004 — We finished the rough electrical and had another round of inspections — rough electrical, rough plumbing and mechanical. Ted finished the trim on the columns. We put in the Hot Mop for the shower floor and tested it (no leaks!). And finished off the chicken wire for the exterior stucco.