Week 26

January 10, 2005  – The second coat of stucco went on Monday, in between rain storms.  The doors returned from being “pre-hung” (installed into a frame) and the trim arrived.  The front doorway is blocked off and the garage-kitchen door is locked.  The current “homework” list includes kitchen cabinet planning, staircase finishing details, tile and granite selection and fireplace mantle design.

Week 27

Last Week