Week 30

February 8, 2005  – The front door arrived!  You can see the beveled glass.  The plywood will stay outside until stucco and paint is finished.  The 2″x2″ shower floor tiles and the 8″x12″ wall/countertop tiles for the master bath arrived.  The downstairs floor was cleaned up of the last odd nails, and was sanded.  The hardwood arrived.  The contrasting color tiles arrived for the bathrooms.  We ended up selecting a Kohler sink that was square, so we could more easily do a flush-to-counter mount.  And Greta decided to try out the master tub!